Reduce unnecessary exposure.
Assess selected locations remotely.
SIS / Security, Inspection & Surveillance
A robo-dog capability built around your security and inspection workflows.
Your team gets the observations needed to decide what happens next.
UAE delivery coordinated by Makeen Robotics.
Illustrative concept. Hardware and payloads are selected for each site.
01 / The benefit
Start with the rounds that need a mobile viewpoint.
Assess selected locations remotely.
Bring the viewpoint to the inspection point.
Follow agreed routes and capture requirements.
Turn reviewed observations into structured records.
These are intended outcomes. A supervised pilot establishes what is achievable at your site.
02 / Three application families
One selected platform can support different approved workflows.
03 / A sample mission
Example: an open service gate is observed during a perimeter round.
Choose the route and inspection points.
Gather the required views at each checkpoint.
An authorised user checks the evidence.
Pass the record to the agreed operational system.
Operator decides the next action.
Mission ID, checkpoint, timestamp, supporting image, data-quality status, reviewer and follow-up reference.
This is a proposed workflow example. It is not a live product screen or customer deployment record.
04 / The complete solution
Makeen coordinates the local delivery scope.
HARDWARE
Match the robot and payloads to the route and task.
CONFIGURATION
Agree checkpoints and capture requirements.
DATA QUALITY
Flag unclear or incomplete results for review.
OPERATIONS
Track mission status and exceptions.
SOFTWARE PARTNER / SIRONA ROBOTICS
Sirona brings task configuration, fleet-management and integration expertise to the scoped solution.
Makeen coordinates site setup and field support. Operator training and ongoing service responsibilities are agreed in the deployment scope.
05 / Integration
Agree the information flow before building the connector.
Route approved findings to the operations team.
Scope the use of robot video feeds.
Associate observations with facility locations.
Create a follow-up record after approval.
Relate readings to plant context.
Link site observations to project records.
Integration availability depends on the selected systems and interfaces. New connectors may require development. Plant-system access starts read-only unless separately authorised.
06 / Potential sites
Each site needs its own operating and safety assessment.
Capture approved equipment checkpoints.
Check designated access points.
Record observations on an approved route.
Revisit designated perimeter locations.
Inspect selected assets with suitable sensors.
Support authorised remote observation.
07 / The first deployment
Use measured results to guide the next step.
Agree the task and operating boundaries.
Select the hardware and required interfaces.
Test against agreed acceptance criteria.
Add routes after reviewing the evidence.
Pilot evidence can include mission logs, reviewed observations and a customer-approved results summary.
08 / Commercial model
Build a site-specific business case before committing to a wider rollout.
Calculator outputs are illustrative. Your SIS proposal will use the agreed task and full deployment scope.
The platform is selected against the route, payload, interfaces and support needs. Each selected model requires integration and site acceptance.
Temperature limits vary by platform and configuration. Heat, dust, duty cycle and charging arrangements must be validated for the intended site.
Standard hardware is not assumed to be certified for explosive atmospheres, fire or chemical exposure. Specialist work needs suitable equipment and operating approvals.
Authorised operators retain operational authority. Access permissions, recording, retention and data handling are agreed with the customer. Hosting and network requirements are established during scoping.
09 / Discuss your site
Tell Makeen about the site and the first task you want to explore.